Sector directory
Manufacturing government contracts (NAICS sector 31-33), page 109
Open contract notices in NAICS sector 31-33, grouped by industry.
Data as of Nov 16, 2026 · Sources: SAM.gov and Grants.gov · About this data
Open notices, page 109 of 130
- CIRCUIT BREAKERClosing in 17 daysPosted Nov 4, 2026 · Due Dec 3, 2026
- CIRCUIT CARD ASSEMBClosing in 17 daysPosted Nov 4, 2026 · Due Dec 3, 2026
- COVERClosing in 17 daysPosted Nov 4, 2026 · Due Dec 3, 2026
- MOTOR,SERVOClosing in 17 daysPosted Nov 4, 2026 · Due Dec 3, 2026
- POWER SUPPLYClosing in 17 daysPosted Nov 4, 2026 · Due Dec 3, 2026
- PROCESSOR,SIGNAL DAClosing in 17 daysPosted Nov 4, 2026 · Due Dec 3, 2026
- RADIAL SENSOR ASSYClosing in 17 daysPosted Nov 4, 2026 · Due Dec 3, 2026
- VALVE, BUTTERFLYClosing in 17 daysPosted Nov 4, 2026 · Due Dec 3, 2026
- VALVE,GATEClosing in 17 daysPosted Nov 4, 2026 · Due Dec 3, 2026
- 31--BEARING,BALL,DUPLEX- AND SIMILAR REPLACEMENT PARTSClosing in 17 daysPosted Oct 29, 2026 · Due Dec 3, 2026
- 45--COMPACTOR,REFUSEClosing in 17 daysPosted Oct 29, 2026 · Due Dec 3, 2026
- REMOTE LAUNCH E PNLClosing in 17 daysPosted Oct 29, 2026 · Due Dec 3, 2026
- 48--GUIDE,VALVE STEMClosing in 17 daysPosted Oct 27, 2026 · Due Dec 3, 2026
- CIRCUIT CARD ASSEMBClosing in 17 daysPosted Oct 20, 2026 · Due Dec 3, 2026
- Supplemental F/A-18E/F and EA-18G Service Life Modification (SLM) Capacity Request for Information (RFI)Closing in 17 daysPosted Nov 11, 2026 · Due Dec 3, 2026
- FMS Kuwait Repair of NSN: 5865-LL-F02-N025 | NOM: BEAM FORMING NETWORK | PN: 8532222-1 | QTY 5Closing in 17 daysPosted Nov 4, 2026 · Due Dec 3, 2026
- HOSE, NONMETALLICClosing in 17 daysPosted Nov 4, 2026 · Due Dec 3, 2026
- KOH CARTRIDGEClosing in 17 daysPosted Nov 4, 2026 · Due Dec 3, 2026
- Weapons Shipping Harness Refurbishment Blanket Purchase AgreementClosing in 17 daysPosted Oct 14, 2026 · Due Dec 3, 2026
- Sources Sought for F15E Grip Assembly Left Hand Controller and F15E Grip Assembly Right Hand ControllerClosing in 17 daysPosted Nov 4, 2026 · Due Dec 3, 2026
- Posted Oct 1, 2026 · Due Dec 3, 2026
- Sources Sought Notice for Mid-IR Optical Frequency CombClosing in 17 daysPosted Nov 20, 2025 · Due Dec 3, 2026
- Handheld X-Ray Fluorescence for ERDC GSLClosing in 17 daysPosted Nov 27, 2025 · Due Dec 3, 2026
- TECHNOLOGY LICENSING OPPORTUNITY: Clathrate Therapeutics PlatformClosing in 18 daysPosted Jun 5, 2026 · Due Dec 4, 2026
- Posted Jun 5, 2026 · Due Dec 4, 2026
- CIRCUIT CARD ASSEMBClosing in 18 daysPosted Nov 4, 2026 · Due Dec 4, 2026
- Trailing Edge, Aircraft_End_Item_B-1_NSN_1560016070987EK_PN_L2400006-001Closing in 18 daysPosted Nov 4, 2026 · Due Dec 4, 2026
- TRANSMITTER, RATE OF FLOWClosing in 18 daysPosted Sep 4, 2026 · Due Dec 4, 2026
- FCC Yazoo City FY 2027 Q2 Food Service Subsistence RequirementsClosing in 18 daysPosted Nov 14, 2026 · Due Dec 4, 2026
- A27-031 Bay Door TrailerClosing in 18 daysPosted Nov 7, 2026 · Due Dec 4, 2026
- 48--VALVE,VENT, IN REPAIR/MODIFICATION OFClosing in 18 daysPosted Nov 6, 2026 · Due Dec 4, 2026
- Commercial Bottled Water Supply and Delivery Support – Republic of Peru (SOUTHCOM AOR)Closing in 18 daysPosted Nov 6, 2026 · Due Dec 4, 2026
- SUBSAFE MAC IDIQClosing in 18 daysPosted Nov 6, 2026 · Due Dec 4, 2026
- Solicitation-FD20302502006_FA811827R0008_ KC-135 HEAT EXCHANGER REMANClosing in 18 daysPosted Nov 5, 2026 · Due Dec 4, 2026
- Posted Oct 29, 2026 · Due Dec 4, 2026
- Thin Layer Explosives (TLX)Closing in 18 daysPosted Oct 23, 2026 · Due Dec 4, 2026
- Gun Control UnitClosing in 18 daysPosted Oct 21, 2026 · Due Dec 4, 2026
- TRANSMITTER,PRESSURClosing in 18 daysPosted Nov 14, 2026 · Due Dec 4, 2026
- CLAMP ASSEMBLY,MUZZClosing in 18 daysPosted Nov 13, 2026 · Due Dec 4, 2026
- PUMP,CENTRIFUGALClosing in 18 daysPosted Nov 11, 2026 · Due Dec 4, 2026
- TEST SET, SURGE PROClosing in 18 daysPosted Nov 7, 2026 · Due Dec 4, 2026
- 48--DISK,VALVE, IN REPAIR/MODIFICATION OFClosing in 18 daysPosted Nov 6, 2026 · Due Dec 4, 2026
- ANALOG BOARDClosing in 18 daysPosted Nov 6, 2026 · Due Dec 4, 2026
- LATCH ASSEMBLY,AIRCClosing in 18 daysPosted Nov 6, 2026 · Due Dec 4, 2026
- NRP,FLAT PANEL DISPClosing in 18 daysPosted Nov 6, 2026 · Due Dec 4, 2026
- 15--PANEL,STRUCTURAL,AIClosing in 18 daysPosted Nov 5, 2026 · Due Dec 4, 2026
- 15--PANEL,STRUCTURAL,AIClosing in 18 daysPosted Nov 5, 2026 · Due Dec 4, 2026
- 16--HEAT EXCHANGER,AIRClosing in 18 daysPosted Nov 5, 2026 · Due Dec 4, 2026
- 16--VANEXIAL FAN,AIRCRA, IN REPAIR/MODIFICATION OFClosing in 18 daysPosted Nov 5, 2026 · Due Dec 4, 2026
- 58--FAIRLEAD COVERClosing in 18 daysPosted Nov 5, 2026 · Due Dec 4, 2026