Contract opportunity

TECHNOLOGY LICENSING OPPORTUNITY: Heat Pipe Reactor Wick and Fill Platform

Special Notice from Department of Energy.

Data as of Oct 24, 2026. Sources: SAM.gov and Grants.gov. Snapshot govcon-directory-20261024T104923Z-2151694.

This product uses the Grants.gov API but is not endorsed or certified by the U.S. Department of Health and Human Services. Counts and totals are computed by DSE from public SAM.gov and Grants.gov notices. Text from Grants.gov may be shortened or have contact details removed. The original notice on Grants.gov is the authoritative version.

Closing in 41 days

Notice details

Agency
Department of Energy
Sub-tier agency
ENERGY, DEPARTMENT OF
Notice type
Special Notice
Solicitation number
S-133680
NAICS
333415 Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing
Product/service code
4540
Place of performance
Los Alamos, New Mexico
Posted
Jun 5, 2026
Response deadline
Dec 4, 2026
Source
SAM.gov

Description

This technology platform from Los Alamos National Laboratory enables more reliable high-temperature heat pipe reactors by improving the way critical wick structures are manufactured and how heat pipe arrays are filled, sealed, and checked for quality. A stronger wick gives the system the capillary action needed to move liquid metal through the pipe under demanding thermal conditions, while the fill platform helps prepare clean, repeatable assemblies that are better suited for reactor-grade use. For organizations working in nuclear, space, or other high-heat environments, the Heat Pipe Reactor Wick and Fill Platform offers a more practical route to building durable thermal hardware with fewer manufacturing bottlenecks. How it Works The Heat Pipe Reactor Wick and Fill Platform begins with wick fabrication, where a fine mesh or similar material is shaped around a mandrel and compressed so the layers can be bonded into a strong porous tube. Depending on the version, the wick can be formed by drawing, hydroforming, or other controlled shaping methods before diffusion bonding locks the structure in place. After bonding, the temporary mandrel and sheath are removed by etching, leaving a porous wick with the pore structure and geometry needed for high-temperature alkali metal heat pipes. The fill process is designed to load, seal, and inspect heat pipe arrays under controlled atmosphere conditions, often using vacuum or inert gas environments. That workflow can be automated with

Summarized from the official notice. The description is shortened; read the full text on the official notice.

Official notice

View on SAM.gov →

Requirements and amendments are controlled by the official notice.

DSE verdict

The DSE fit verdict for this notice is available to DSE GovCon subscribers. It is not published on this page.

See DSE GovCon plans →

Similar open notices

  1. Facility Vacuum System ChillersClosing in 3 daysENERGY, DEPARTMENT OF · Posted Oct 22, 2026 · Closes Oct 27, 2026

Get free alerts

Email alerts for notices like this one are free on DSE GovCon Intelligence.

Set up free alerts →

Frequently asked questions

When is the response deadline?

The published deadline is Dec 4, 2026. That is 41 days after the data date.

What NAICS code applies?

NAICS 333415, Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing.

Which agency issued this notice?

Department of Energy.

Where is the official notice?

The link under Official notice opens the source listing.