Sector directory
Manufacturing government contracts (NAICS sector 31-33), page 70
Open contract notices in NAICS sector 31-33, grouped by industry.
Data as of Nov 14, 2026 · Sources: SAM.gov and Grants.gov · About this data
Open notices, page 70 of 124
- 62--FIXTURE,LIGHTINGClosing in 10 daysPosted Nov 13, 2026 · Due Nov 24, 2026
- 62--LAMP,LIGHT EMITTING DIClosing in 10 daysPosted Nov 13, 2026 · Due Nov 24, 2026
- 62--LIGHT,INDICATORClosing in 10 daysPosted Nov 13, 2026 · Due Nov 24, 2026
- 63--SENSING ELEMENT,FIRE DClosing in 10 daysPosted Nov 13, 2026 · Due Nov 24, 2026
- 66--INDICATOR,DIGITAL DISPClosing in 10 daysPosted Nov 13, 2026 · Due Nov 24, 2026
- 66--PANEL,TEST,ELECTRICALClosing in 10 daysPosted Nov 13, 2026 · Due Nov 24, 2026
- 66--TEST SET,TRANSPONDEClosing in 10 daysPosted Nov 13, 2026 · Due Nov 24, 2026
- 84--BAG,DROP LEGClosing in 10 daysPosted Nov 13, 2026 · Due Nov 24, 2026
- 95--PLATE,METALClosing in 10 daysPosted Nov 13, 2026 · Due Nov 24, 2026
- 95--SHEET,METALClosing in 10 daysPosted Nov 13, 2026 · Due Nov 24, 2026
- 95--SHEET,METALClosing in 10 daysPosted Nov 13, 2026 · Due Nov 24, 2026
- 95--SHEET,METALClosing in 10 daysPosted Nov 13, 2026 · Due Nov 24, 2026
- 73--Equipment IST - FTRDClosing in 10 daysPosted Nov 13, 2026 · Due Nov 24, 2026
- 10--BREECH ASSEMBLYClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 10--ELEVATING MECHANISM,MOClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 12--WORM SHAFT ASSEMBLYClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 17--BRACE,AIRCRAFT GROUClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 17--CABLE ASSEMBLY,AIRCClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 17--CART SERVICING,NITROGEClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 17--COVER,AIRCRAFT ENGINEClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 17--COVER,AIRCRAFT ENGINEClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 17--FILTER ASSEMBLY,OILClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 17--INTERMODUL FLANGEClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 17--NRP,VARIABLE TRANSFClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 17--SKID,BOMBClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 17--SLING,AIRCRAFT MAINTENClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 17--STRUT ASSEMBLY,DEFLECTClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 20--DOOR,METAL,MARINE SClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 20--HEAVING LINEClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 25--ARM,DIRECTIONAL SIGNALClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 25--BODY,CARGO TRUCKClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 25--COOLER,FLUID,TRANSMISSClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 25--CUSHION,SEAT BACK,VEHIClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 25--FENDER,VEHICULARClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 25--GRILLE,METALClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 25--RING ASSEMBLY,TURRET RClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 25--SPRING ASSEMBLY,LEAFClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 29--FILTER ELEMENT,FLUIDClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 29--HOUSING,FUEL PUMPClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 29--PUMP,COOLING SYSTEM,ENClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 29--TANK,FUEL,ENGINEClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 29--THERMOSTAT ASSEMBLYClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 30--CONNECTING LINK,RIGClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 30--CONNECTING LINK,RIGIDClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 30--CYLINDER ASSEMBLY,ACTUClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 30--GEAR,HELICALClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 30--GEAR SET,BEVEL,MATCHEDClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 30--GEAR SET,SPUR,MATCHEDClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 30--SHAFT,SHOULDEREDClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026
- 30--SHAFT,SHOULDEREDClosing in 10 daysPosted Nov 12, 2026 · Due Nov 24, 2026