OR FS FREWN602 28(1), Road 28 Reconstruction
Presolicitation from Department of Transportation.
Data as of Nov 16, 2026 · Sources: SAM.gov and Grants.gov · About this data
Notice details
- Sub-tier agency
- FEDERAL HIGHWAY ADMINISTRATION
- Notice type
- Presolicitation
- Solicitation number
- 69056727B000001
- Product/service code
- Y1LB
- Set-aside
- Total Small Business
- Place of performance
- Silver Lake, Oregon
- Posted
- Nov 3, 2026
- Response deadline
- No deadline stated
- Source
- SAM.gov
Description
OR FS FREWN602 28(1), Road 28 Reconstruction Total Small Business Set-Aside This work consists of full depth reclamation of the existing roadway, aggregate surfacing and drainage. Base: will reconstruct approximately 8.3 miles of full depth reclamation of the existing roadway, aggregate surfacing and drainage. Option X: includes an additional 3.4 miles of full depth reclamation Option Y: includes an additional 14.1 miles of full depth reclamation Option Z: includes 7.5 miles of minor asphalt patches. Project Location: This project is located approximately six miles south of Silver Lake, OR. Estimated Price Range: Between $5,000,000 and $10,000,000 Tentative Solicitation Date: January/February 2027 Tentative Fixed Completion Date: Base: July 2027 Option X: July 2027 Option Y: September 2027 Option Z: August 2027 INTERESTED VENDORS LIST: The Interested Vendor List on SAM.gov is viewable only by users who are linked to an entity with an active Unique Entity Identifier (UEI) and hold an assigned role (such as Contract Opportunities Administrator, Data Viewer, or Data Entry). The Federal Government does not maintain or provide a separate plan holders list. If you need assistance, go to https://www.fsd.gov/gsafsd_sp. PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis. To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the �follow� button at the top
Summarized from the official notice. The description is shortened; read the full text on the official notice.
Official notice
Requirements and amendments are controlled by the official notice.
DSE verdict
The DSE fit verdict for this notice is available to DSE GovCon subscribers. It is not published on this page.
See DSE GovCon plans →Similar open notices
- Acadia National ParkClosing in 1 dayPosted Nov 13, 2026 · Due Nov 17, 2026
- AZ BL COLO 7528(1) Burro Creek RoadClosing in 1 dayPosted Nov 13, 2026 · Due Nov 17, 2026
- UT NP ARCH 100(2) Bridges on Delicate Arch RoadClosing in 3 daysPosted Oct 23, 2026 · Due Nov 19, 2026
- Northeast Region Pavement and Bridge Preservation Construction - NP NER PMS BMS FY24(1)Closing in 15 daysPosted Nov 3, 2026 · Due Dec 1, 2026
- AK FLAP ANCHORAGE 2021(1), Far North Bicentennial Park EnhancementsClosing in 15 daysPosted Nov 11, 2026 · Due Dec 1, 2026
Get free alerts
Email alerts for notices like this one are free on DSE GovCon Intelligence.
Set up free alerts →Frequently asked questions
Is there a set-aside?
The notice lists the set-aside Total Small Business.
What NAICS code applies?
NAICS 237310, Highway, Street, and Bridge Construction.
Which agency issued this notice?
Department of Transportation.
Where is the official notice?
The link under Official notice opens the source listing.