Contract opportunity

UT NP ARCH 100(2) Bridges on Delicate Arch Road

Solicitation from Department of Transportation.

Data as of Oct 24, 2026. Sources: SAM.gov and Grants.gov. Snapshot govcon-directory-20261024T104923Z-2151694.

This product uses the Grants.gov API but is not endorsed or certified by the U.S. Department of Health and Human Services. Counts and totals are computed by DSE from public SAM.gov and Grants.gov notices. Text from Grants.gov may be shortened or have contact details removed. The original notice on Grants.gov is the authoritative version.

Closing in 26 days

Notice details

Agency
Department of Transportation
Sub-tier agency
FEDERAL HIGHWAY ADMINISTRATION
Notice type
Solicitation
Solicitation number
6982AF27B000005
NAICS
237310 Highway, Street, and Bridge Construction
Product/service code
Y1LB
Place of performance
Moab, Utah
Posted
Oct 23, 2026
Response deadline
Nov 19, 2026
Source
SAM.gov

Description

PROJECT NUMBER: UT NP ARCH 100(2) PROJECT NAME: Bridges on Delicate Arch Road PROJECT DESCRIPTION: Delicate Arch Road (DAR) is within Arches National Park (Park) and provides access to Delicate Arch. DAR is a functional class 1 roadway (Principal Park Road) and is heavily traveled by visitors and often congested during periods with moderate-to-high levels of visitation. DAR crosses three low-gradient ephemeral washes (Salt Valley Wash, Salt Wash, and Winter Camp Wash) near their confluence in the Salt Wash Basin downstream of Wolfe Ranch. Culverts installed during original road construction in the mid-1990s and during subsequent upgrades are inadequate to allow unobstructed stream flow and sediment transport downstream. This existing condition produces flooding and sediment deposition, which creates unsafe conditions for visitors, triggers road closures, potentially strands Park visitors, diminishes visitor experience of the Park, and generates high operational costs associated with traffic management, visitor safety, and cleanup operations. SCOPE OF THE WORK: This project will be designated as Reconstruction (4R) with one segment of restoration (3R), and will design and construct 100� span concrete bridges at the Salt Valley Wash, Salt Wash, and Winter Camp Wash. The DA roadway profile at each Wash will be raised to accommodate a 10-year design frequency and allow a medium-sized excavator to access each wash. The DA will be realigned at the Salt Valley wash, moving the

Summarized from the official notice. The description is shortened; read the full text on the official notice.

Official notice

View on SAM.gov →

Requirements and amendments are controlled by the official notice.

DSE verdict

The DSE fit verdict for this notice is available to DSE GovCon subscribers. It is not published on this page.

See DSE GovCon plans →

Similar open notices

  1. CO NP ROMO 407(1) Holzwarth CulvertClosing in 3 daysTRANSPORTATION, DEPARTMENT OF · Posted Oct 21, 2026 · Closes Oct 27, 2026
  2. Natchez Trace Parkway Project MS NP NATR 3F26Closing in 10 daysTRANSPORTATION, DEPARTMENT OF · Posted Oct 20, 2026 · Closes Nov 3, 2026
  3. ND NP THRO 204(1) Buck Hill RoadClosing in 10 daysTRANSPORTATION, DEPARTMENT OF · Posted Oct 15, 2026 · Closes Nov 3, 2026
  4. TX FW LGA 10(5) Steve Thompson Wildlife DriveClosing in 10 daysTRANSPORTATION, DEPARTMENT OF · Total Small Business · Posted Oct 15, 2026 · Closes Nov 3, 2026
  5. WY BR WYAO US20(1) US 20 and Hayden Arch Bridge RepairsClosing in 11 daysTRANSPORTATION, DEPARTMENT OF · Posted Oct 22, 2026 · Closes Nov 4, 2026

Get free alerts

Email alerts for notices like this one are free on DSE GovCon Intelligence.

Set up free alerts →

Frequently asked questions

When is the response deadline?

The published deadline is Nov 19, 2026. That is 26 days after the data date.

What NAICS code applies?

NAICS 237310, Highway, Street, and Bridge Construction.

Which agency issued this notice?

Department of Transportation.

Where is the official notice?

The link under Official notice opens the source listing.