ND NP THRO 204(1) Buck Hill Road
Solicitation from Department of Transportation.
Data as of Oct 24, 2026. Sources: SAM.gov and Grants.gov. Snapshot govcon-directory-20261024T104923Z-2151694.
This product uses the Grants.gov API but is not endorsed or certified by the U.S. Department of Health and Human Services. Counts and totals are computed by DSE from public SAM.gov and Grants.gov notices. Text from Grants.gov may be shortened or have contact details removed. The original notice on Grants.gov is the authoritative version.
Closing in 10 days
Notice details
- Sub-tier agency
- FEDERAL HIGHWAY ADMINISTRATION
- Notice type
- Solicitation
- Solicitation number
- 6982AF25B000004
- Product/service code
- Y1LB
- Place of performance
- Medora, North Dakota
- Posted
- Oct 15, 2026
- Response deadline
- Nov 3, 2026
- Source
- SAM.gov
Description
INVITATION FOR BID (IFB) FULL AND OPEN COMPETITION WITH HUBZONE PREFERENCE PROJECT NUMBER: ND NP THRO 204(1) PROJECT NAME: Buck Hill Road PROJECT DESCRIPTION: Buck Hill Road, also known as Route 204, is located in Billings County within Theodore Roosevelt (THRO) National Park (NP) in the southeast portion of the park near the South Unit, Medora, ND. The route is located in mountainous terrain at approximate elevation of 2,500 to 2,800 feet. It begins at the intersection of Buck Hill Road and South Unit Scenic Loop Road. The route then proceeds southeasterly for approximately � of a mile and ascends approximately 300 feet vertically to the Buck Hill Overlook parking area. The route is located entirely within Theodore Roosevelt NP. There is one (1) base schedule and no options. SCOPE OF THE WORK: The project includes three major components; 1) Approximately � mile of roadway rehabilitation, 2) Approximately 1,000 linear feet of deep subexcavation to address an existing landslide, and 3) Reconstructing the existing Buck Hill Overlook parking lot. The main roadway rehabilitation includes pulverization of the existing roadway, placement of new roadway aggregate, and new hot asphalt concrete pavement and replacing existing guardrail with new guardrail. Additionally, this work includes constructing new paved ditches and installing concrete curb and gutter along most of the length of the roadway. This includes installation of several drainage inlets and culverts as well as new
Summarized from the official notice. The description is shortened; read the full text on the official notice.
Official notice
Requirements and amendments are controlled by the official notice.
DSE verdict
The DSE fit verdict for this notice is available to DSE GovCon subscribers. It is not published on this page.
See DSE GovCon plans →Similar open notices
- CO NP ROMO 407(1) Holzwarth CulvertClosing in 3 days
- Natchez Trace Parkway Project MS NP NATR 3F26Closing in 10 days
- TX FW LGA 10(5) Steve Thompson Wildlife DriveClosing in 10 days
- WY BR WYAO US20(1) US 20 and Hayden Arch Bridge RepairsClosing in 11 days
- WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4Closing in 11 days
Get free alerts
Email alerts for notices like this one are free on DSE GovCon Intelligence.
Set up free alerts →Frequently asked questions
When is the response deadline?
The published deadline is Nov 3, 2026. That is 10 days after the data date.
What NAICS code applies?
NAICS 237310, Highway, Street, and Bridge Construction.
Which agency issued this notice?
Department of Transportation.
Where is the official notice?
The link under Official notice opens the source listing.