AZ BL COLO 7528(1) Burro Creek Road
Solicitation from Department of Transportation.
Data as of Oct 24, 2026. Sources: SAM.gov and Grants.gov. Snapshot govcon-directory-20261024T104923Z-2151694.
This product uses the Grants.gov API but is not endorsed or certified by the U.S. Department of Health and Human Services. Counts and totals are computed by DSE from public SAM.gov and Grants.gov notices. Text from Grants.gov may be shortened or have contact details removed. The original notice on Grants.gov is the authoritative version.
Closing in 24 days
Notice details
- Sub-tier agency
- FEDERAL HIGHWAY ADMINISTRATION
- Notice type
- Solicitation
- Solicitation number
- 6982AF27B000002
- Product/service code
- Y1LB
- Set-aside
- Total Small Business
- Place of performance
- Kingman, Arizona
- Posted
- Oct 16, 2026
- Response deadline
- Nov 17, 2026
- Source
- SAM.gov
Description
PROJECT DESCRIPTION: Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles. SCOPE OF THE WORK: The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items: Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats. Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project. Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings
Summarized from the official notice. The description is shortened; read the full text on the official notice.
Official notice
Requirements and amendments are controlled by the official notice.
DSE verdict
The DSE fit verdict for this notice is available to DSE GovCon subscribers. It is not published on this page.
See DSE GovCon plans →Similar open notices
- CO NP ROMO 407(1) Holzwarth CulvertClosing in 3 days
- Natchez Trace Parkway Project MS NP NATR 3F26Closing in 10 days
- ND NP THRO 204(1) Buck Hill RoadClosing in 10 days
- TX FW LGA 10(5) Steve Thompson Wildlife DriveClosing in 10 days
- WY BR WYAO US20(1) US 20 and Hayden Arch Bridge RepairsClosing in 11 days
Get free alerts
Email alerts for notices like this one are free on DSE GovCon Intelligence.
Set up free alerts →Frequently asked questions
When is the response deadline?
The published deadline is Nov 17, 2026. That is 24 days after the data date.
Is there a set-aside?
The notice lists the set-aside Total Small Business.
What NAICS code applies?
NAICS 237310, Highway, Street, and Bridge Construction.
Which agency issued this notice?
Department of Transportation.
Where is the official notice?
The link under Official notice opens the source listing.