Sector directory
Manufacturing government contracts (NAICS sector 31-33), page 48
Open contract notices in NAICS sector 31-33, grouped by industry.
Data as of Nov 14, 2026 · Sources: SAM.gov and Grants.gov · About this data
Open notices, page 48 of 124
- N0038326PR0R831_FMSClosing in 6 daysPosted Oct 21, 2026 · Due Nov 20, 2026
- N0038326PR0R852_FMSClosing in 6 daysPosted Oct 21, 2026 · Due Nov 20, 2026
- N0038326PR0R849_FMSClosing in 6 daysPosted Oct 20, 2026 · Due Nov 20, 2026
- N0038326PR0R851_FMSClosing in 6 daysPosted Oct 20, 2026 · Due Nov 20, 2026
- Two (2) Plastic Media Blast BoothsClosing in 6 daysPosted Nov 6, 2026 · Due Nov 20, 2026
- ARMOR,TRANSPARENT,VEHICULAR WINDOWClosing in 6 daysPosted Nov 5, 2026 · Due Nov 20, 2026
- GEAR SET,WORM AND WORM WHEEL,MATCHEDClosing in 6 daysPosted Nov 5, 2026 · Due Nov 20, 2026
- PAE Maritime Fall 2026 Industry DayClosing in 6 daysPosted Oct 27, 2026 · Due Nov 20, 2026
- 65--BLANKET,SURVIVALClosing in 6 daysPosted Nov 14, 2026 · Due Nov 20, 2026
- 65--SUCTION APPARATUS,SURGClosing in 6 daysPosted Nov 14, 2026 · Due Nov 20, 2026
- 83--FASTENER TAPE,PILEClosing in 6 daysPosted Nov 14, 2026 · Due Nov 20, 2026
- 16--SLEEVE,HOUSING,HEADClosing in 6 daysPosted Nov 13, 2026 · Due Nov 20, 2026
- 29--IGNITION UNIT,VOLTAGEClosing in 6 daysPosted Nov 13, 2026 · Due Nov 20, 2026
- 42--RESPIRATOR OUTFITClosing in 6 daysPosted Nov 13, 2026 · Due Nov 20, 2026
- 15--CONNECTOR,RAIL RAMPClosing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 15--CONVEYOR,ROLLER ASSEMBClosing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 15--DRAIN-VENT,AIRCRAFTClosing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 15--DUCT ASSEMBLY,BLEED AIClosing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 15--ELBOW ASSEMBLY,COMPRESClosing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 15--FAIRING,AIRCRAFTClosing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 15--FAIRING-LE,INBD,LWRClosing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 15--INTERCOSTAL,AIRCRAFTClosing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 15--PANEL,STRUCTURAL,AIRCRClosing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 15--PHENOLIC BLOCK,FLAP SEClosing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 15--PLATE,STRUCTURAL,AIRCRClosing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 15--SKIN,AIRCRAFTClosing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 15--SKIN,AIRCRAFTClosing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 15--SKIN,AIRCRAFTClosing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 15--SPAR,AIRCRAFTClosing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 15--STABILIZER,VENTRALClosing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 15--STIFFENER,AIRCRAFTClosing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 15--TUBE ASSEMBLY,BLEED AIClosing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 16--BRACKET,SUPPORTClosing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 16--CRANK,SERVOVALVEClosing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 16--FILTER BODY,FLUIDClosing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 16--HOUSING,PORTING,PUMP HClosing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 16--LEVER,REMOTE CONTROLClosing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 16--LOCK LINK ASSEMBLYClosing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 16--MATTRESS,AIRCRAFTClosing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 16--PANEL ASSEMBLY-CONTClosing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 16--RING,BEARING RETAINER,Closing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 16--SKID TUBE ASSEMBLY,AIRClosing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 16--VALVE,DEFUEL,AIRCRAClosing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 29--CONTROL ASSEMBLY,PUSH-Closing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 29--HOUSING,GATE VALVEClosing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 31--BEARING,BALL,ANNULARClosing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 31--BEARING HALF SET,SLEEVClosing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 31--BEARING,PLAIN,ROD EClosing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 31--BEARING,PLAIN,SELF-ALIClosing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 31--BEARING,ROLLER,THRUSTClosing in 6 daysPosted Nov 12, 2026 · Due Nov 20, 2026