Sector directory
Manufacturing government contracts (NAICS sector 31-33), page 27
Open contract notices in NAICS sector 31-33, grouped by industry.
Data as of Nov 10, 2026 · Sources: SAM.gov and Grants.gov · About this data
Open notices, page 27 of 116
- 66--MANOMETER,ANEROIDClosing in 4 daysPosted Nov 6, 2026 · Due Nov 14, 2026
- 66--METER,IMPELLER TYPE,LIClosing in 4 daysPosted Nov 6, 2026 · Due Nov 14, 2026
- 66--PROBE,HUMIDITY-TEMPERAClosing in 4 daysPosted Nov 6, 2026 · Due Nov 14, 2026
- 66--TRANSMITTER,LIQUID QUAClosing in 4 daysPosted Nov 6, 2026 · Due Nov 14, 2026
- 66--TRANSMITTER,PRESSUREClosing in 4 daysPosted Nov 6, 2026 · Due Nov 14, 2026
- 66--TRANSMITTER,PRESSUREClosing in 4 daysPosted Nov 6, 2026 · Due Nov 14, 2026
- 81--COVER,SHIPPING AND STOClosing in 4 daysPosted Nov 6, 2026 · Due Nov 14, 2026
- 10--BAR,GUIDEClosing in 4 daysPosted Nov 5, 2026 · Due Nov 14, 2026
- 28--SHROUD,HPT,STATORClosing in 4 daysPosted Nov 4, 2026 · Due Nov 14, 2026
- 29--COOLER,LUBRICATING OILClosing in 4 daysPosted Nov 4, 2026 · Due Nov 14, 2026
- 48--VALVE,FLOW CONTROLClosing in 4 daysPosted Nov 4, 2026 · Due Nov 14, 2026
- 10--EJECTOR PISTONClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 10--MAINTENANCE KIT,GUNClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 17--COVER,AIRCRAFT ENGINEClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 20--PISTON,RESONANCE CHClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 25--CONTROL,ANTI-LOCK BClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 25--HATCH,ROOF ASSEMBLY,VEClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 25--WHEEL ASSEMBLY,PNEUClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 28--MANIFOLD,EXHAUSTClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 28--MANIFOLD,REGULATORClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 29--FILTER,FLUIDClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 29--GENERATOR,ENGINE ACClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 30--GEAR,HELICALClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 30--GEARSHAFT,MULTIPLE GEAClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 34--WELDING QUALIFICATIONClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 41--FAN,CIRCULATINGClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 41--FAN,VANEAXIALClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 42--SIZING TOOLClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 44--DEHUMIDIFIER,DESICCANTClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 47--ADAPTERClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 47--COUPLING,SEAL RINGClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 47--HOSE,AIR DUCTClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 47--HOSE ASSEMBLY,LOW PClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 47--HOSE ASSEMBLY,METALClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 47--HOSE ASSEMBLY,NONMEClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 47--HOSE ASSEMBLY,NONMEClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 47--HOSE ASSEMBLY,NONMETALClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 47--HOSE ASSEMBLY,NONMETALClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 47--HOSE ASSEMBLY SET,NONMClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 47--HOSE,NONMETALLICClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 47--MANIFOLD ASSEMBLYClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 47--PLUGSTAT,HYDRAULIC SYSClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 47--SLE EVE,COMPRESSION,Closing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 47--TUBE AND FITTINGS,METAClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 47--TUBE,METALLICClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 47--TUBE,METALLICClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 48--BODY,VALVEClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 48--COCK,POPPET DRAINClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 48--SLIDE,SLEEVE,VALVEClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026
- 48--VALVE,LINEAR,DIRECTIONClosing in 4 daysPosted Nov 3, 2026 · Due Nov 14, 2026