Set-aside directory
Women-Owned Small Business (WOSB and EDWOSB) set-aside contracts
Open contract notices reserved under the Women-Owned Small Business (WOSB and EDWOSB) set-aside.
Data as of Nov 15, 2026 · Sources: SAM.gov and Grants.gov · About this data
90Open now
53Closing in 7 days
86Closing in 30 days
As of Nov 15, 2026, 90 open notices carry a Women-Owned Small Business (WOSB and EDWOSB) set-aside (Women-Owned Small Business: 89, Women-Owned Small Business Sole Source: 1). 86 close within 30 days.
Open notices, closing soonest first
- 15--SCRAPERClosing in 2 daysPosted Nov 9, 2026 · Due Nov 17, 2026
- 62--LIGHT,UTILITY,NIGHT VIClosing in 2 daysPosted Nov 9, 2026 · Due Nov 17, 2026
- 62--STOP LIGHT,VEHICULARClosing in 2 daysPosted Nov 9, 2026 · Due Nov 17, 2026
- 20--TRANSMISSION,MECHANICAClosing in 2 daysPosted Nov 7, 2026 · Due Nov 17, 2026
- 25--MODIFICATION KIT,VEHICClosing in 2 daysPosted Nov 7, 2026 · Due Nov 17, 2026
- 26--TIRE,PNEUMATIC,VEHICULClosing in 2 daysPosted Nov 7, 2026 · Due Nov 17, 2026
- 47--TUBE,METALLICClosing in 2 daysPosted Nov 7, 2026 · Due Nov 17, 2026
- 48--BODY,VALVEClosing in 2 daysPosted Nov 7, 2026 · Due Nov 17, 2026
- 61--BATTERY POWER SUPPLYClosing in 2 daysPosted Nov 7, 2026 · Due Nov 17, 2026
- 66--ADAPTIVE DIAGNOSTIC ELClosing in 2 daysPosted Nov 7, 2026 · Due Nov 17, 2026
- 66--DETECTOR,GASClosing in 2 daysPosted Nov 7, 2026 · Due Nov 17, 2026
- 10--RING ASSEMBLY,TURRET RClosing in 2 daysPosted Nov 6, 2026 · Due Nov 17, 2026
- 10--SLIDE,PISTOLClosing in 2 daysPosted Nov 6, 2026 · Due Nov 17, 2026
- 25--CLAMP,TOW BARClosing in 2 daysPosted Nov 6, 2026 · Due Nov 17, 2026
- 43--PARTS KIT,FLUID PRESSUClosing in 2 daysPosted Nov 6, 2026 · Due Nov 17, 2026
- 43--PUMPING UNIT,HYDRAULICClosing in 2 daysPosted Nov 6, 2026 · Due Nov 17, 2026
- 47--COUPLING HALF,QUICK DIClosing in 2 daysPosted Nov 6, 2026 · Due Nov 17, 2026
- 48--VALVE,CHECKClosing in 2 daysPosted Nov 6, 2026 · Due Nov 17, 2026
- 48--VALVE,PLUGClosing in 2 daysPosted Nov 6, 2026 · Due Nov 17, 2026
- 48--VALVE,SAFETY RELIEFClosing in 2 daysPosted Nov 6, 2026 · Due Nov 17, 2026
- 59--CONNECTOR,PLUG,ELECTRIClosing in 2 daysPosted Nov 6, 2026 · Due Nov 17, 2026
- 59--ELECTRON TUBEClosing in 2 daysPosted Nov 6, 2026 · Due Nov 17, 2026
- 59--RELAY,THERMALClosing in 2 daysPosted Nov 6, 2026 · Due Nov 17, 2026
- 66--MAGNIFIERClosing in 2 daysPosted Nov 6, 2026 · Due Nov 17, 2026
- 10--MOUNT,SWIVELClosing in 2 daysPosted Nov 5, 2026 · Due Nov 17, 2026
- 25--BOX,ACCESSORIES STOWAGClosing in 2 daysPosted Nov 5, 2026 · Due Nov 17, 2026
- 36--SHREDDING MACHINE,PAPEClosing in 2 daysPosted Nov 5, 2026 · Due Nov 17, 2026
- 95--PLATE,METALClosing in 2 daysPosted Nov 5, 2026 · Due Nov 17, 2026
- 95--SHEET,METALClosing in 2 daysPosted Nov 4, 2026 · Due Nov 17, 2026
- 95--SHEET,METALClosing in 2 daysPosted Nov 4, 2026 · Due Nov 17, 2026
- Valve, Breakaway, FuelClosing in 2 daysPosted Nov 13, 2026 · Due Nov 17, 2026
- RFI-SELA LOUNGE SEATING CHAIRSClosing in 2 daysPosted Nov 14, 2026 · Due Nov 17, 2026
- 59--ANTENNAClosing in 3 daysPosted Nov 3, 2026 · Due Nov 18, 2026
- 59--ANTENNAClosing in 3 daysPosted Nov 3, 2026 · Due Nov 18, 2026
- 59--ANTENNAClosing in 3 daysPosted Nov 3, 2026 · Due Nov 18, 2026
- 59--RJ45 8-PIN MODULAR PLUClosing in 3 daysPosted Nov 3, 2026 · Due Nov 18, 2026
- 61--LEAD,ELECTRICALClosing in 3 daysPosted Nov 3, 2026 · Due Nov 18, 2026
- 61--POWER SUPPLYClosing in 3 daysPosted Nov 3, 2026 · Due Nov 18, 2026
- 66--TUBE,COLLIMATORClosing in 3 daysPosted Nov 3, 2026 · Due Nov 18, 2026
- Municipal Separate Storm Sewer System (MS4)Closing in 3 daysPosted Nov 13, 2026 · Due Nov 18, 2026
- Notice of Intent to Award - sole source purchase for Hydronic Water Treatment Services under WOSB/EDWOSB programClosing in 3 daysPosted Nov 13, 2026 · Due Nov 18, 2026
- 59--DELAY LINEClosing in 4 daysPosted Nov 4, 2026 · Due Nov 19, 2026
- NIST/G Trash and Recycling Removal New ContractClosing in 4 daysPosted Nov 11, 2026 · Due Nov 19, 2026
- 15--PLATE,STRUCTURAL,AIRCRClosing in 5 daysPosted Nov 12, 2026 · Due Nov 20, 2026
- 10--MOUNT,SWIVELClosing in 5 daysPosted Nov 9, 2026 · Due Nov 20, 2026
- 20--STOPPER ASSEMBLY,CABLEClosing in 5 daysPosted Nov 9, 2026 · Due Nov 20, 2026
- 59--ELECTRONIC MODULE,STANClosing in 5 daysPosted Nov 9, 2026 · Due Nov 20, 2026
- 59--SWITCH,PUSHClosing in 5 daysPosted Nov 9, 2026 · Due Nov 20, 2026
- 59--ADAPTER,SOCKET,PLUG-INClosing in 5 daysPosted Nov 5, 2026 · Due Nov 20, 2026
- EDUCATION SERVICE SUPPORT CONTRACT (ESSC)Closing in 5 daysPosted Oct 17, 2026 · Due Nov 20, 2026
Agencies with Women-Owned Small Business (WOSB and EDWOSB) notices
- Department of Defense 83 open
- Department of Homeland Security 2 open
- Department of Commerce 1 open
- Department of Veterans Affairs 1 open
- Department of Transportation 1 open
- Department of the Interior 1 open
- General Services Administration 1 open
Top industries
- Industrial Valve Manufacturing (NAICS 332911) 7 open
- Small Arms, Ordnance, and Ordnance Accessories Manufacturing (NAICS 332994) 5 open
- Commercial and Service Industry Machinery Manufacturing (NAICS 333310) 5 open
- Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing (NAICS 334220) 5 open
- Other Aircraft Parts and Auxiliary Equipment Manufacturing (NAICS 336413) 4 open
- Other Electronic Component Manufacturing (NAICS 334419) 4 open
- Nonferrous Metal (except Copper and Aluminum) Rolling, Drawing, and Extruding (NAICS 331491) 4 open
- Electronic Connector Manufacturing (NAICS 334417) 3 open
- Motor Vehicle Electrical and Electronic Equipment Manufacturing (NAICS 336320) 2 open
- Mechanical Power Transmission Equipment Manufacturing (NAICS 333613) 2 open
Get free alerts
Email alerts for Women-Owned Small Business (WOSB and EDWOSB) are free on DSE GovCon Intelligence.
Set up free alerts →DSE verdict
The DSE fit verdict for these Women-Owned Small Business (WOSB and EDWOSB) notices is available to DSE GovCon subscribers. It is not published on this page.
See DSE GovCon plans →