Notice index
All open government contract notices, page 120
Every open notice in the directory, closing soonest first.
Data as of Oct 24, 2026. Sources: SAM.gov and Grants.gov. Snapshot govcon-directory-20261024T104923Z-2151694.
This product uses the Grants.gov API but is not endorsed or certified by the U.S. Department of Health and Human Services. Counts and totals are computed by DSE from public SAM.gov and Grants.gov notices. Text from Grants.gov may be shortened or have contact details removed. The original notice on Grants.gov is the authoritative version.
Open notices, page 120 of 181
- N0038326PR0R075_FMSClosing in 27 days
- N0038326PR0R803_FMSClosing in 27 days
- EDUCATION SERVICE SUPPORT CONTRACT (ESSC)Closing in 27 days
- Pilot SeatsClosing in 27 days
- Z1DA--Local | 460-26- 4-5074-0108 | 460-26-999 | Condenser Water Piping Modification | (VA-26-00077929)Closing in 27 days
- PARTS KIT SEAL REPLACEMENTClosing in 27 days
- Renovation at Truman Hall Headquarters in Fort Belvoir, VAClosing in 27 days
- Z2DA--537-24-106 Create Contractor Lie-Down ZoneClosing in 27 days
- Sources Sought for FY26 Atlantic Intracoastal Waterway Maintenance Dredging ��������� Select SitesClosing in 27 days
- Tucson CMOP Shipping Box/CoolersClosing in 27 days
- 88th RD US ARMY RESERVE CENTER MONCLOVA, OH CONSTRUCT STORAGE BUILDING AND REPAIR MEP LOTSClosing in 27 days
- C221--402-27-001 Repair Chiller 3 (AE)Closing in 27 days
- Request for Information for Event Transportation Logistics Coordination ServicesClosing in 27 days
- Paving Acquisition Vehicle - Rockies (PAV-R) IDIQ Sources SoughtClosing in 27 days
- FA811826R0057 - REMAN E-3 AI GEARBOX ASSEMBLYClosing in 27 days
- Protective Security Officer Services, Los Angeles AreaClosing in 27 days
- FD2030-26-00223Closing in 27 days
- FD2030-26-00453Closing in 27 days
- Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CTClosing in 27 days
- 10--DRUM,INNER, IN REPAIR/MODIFICATION OFClosing in 27 days
- 59--CIRCUIT BREAKER, IN REPAIR/MODIFICATION OFClosing in 27 days
- 15--RUDDER,AIRCRAFT, IN REPAIR/MODIFICATION OFClosing in 27 days
- PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDAClosing in 27 days
- Design-Build Maintenance and Repair Army Reserve (MRAR) of Equipment Concentration Site (ECS), B-56767, at North Fort Hood, TXClosing in 27 days
- STABILIZER BAR DAMPER ASSEMBLY / 27F, HH-60 ALL VARIATIONS PAVE HAWK HELICOPTERClosing in 27 days
- Venous Thrombosis (VT)Closing in 27 days
- J061--Triennial Circuit Breaker and Feeder TestingClosing in 27 days
- Mather Fueling System RepairsClosing in 27 days
- Smartphone Style Mobile Barcode ScannersClosing in 27 days
- Jackson, MS Jackson Main Office P&DC - Roof Replacement C10122Closing in 27 days
- RFI - Repair of C-5 COMPUTER, DIGITALClosing in 27 days
- NCI OA Special Notice of Subcontract Opportunity at the Frederick National Laboratory for Cancer Research”Closing in 27 days
- Phase 2 Construct Arabian Leopard Exhibit at the National Zoological ParkClosing in 27 days
- Y--EAST CANAL EFFICIENCY IMPROVEMENTSClosing in 27 days
- Denver, CO Denver P&DC Roof Replacement K95856Closing in 27 days
- Laboratory Capabilities to Test Railroad Tank Car Thermal Protection Systems (TPS)Closing in 27 days
- Modernize 6N Inpatient Restrooms (Swing for 3N)Closing in 27 days
- Supply Thermal Protection Systems for Railroad Tank CarsClosing in 27 days
- 11F | C5 | DUCT ASSEMBLY, BLEED AIRClosing in 27 days
- Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund SiteClosing in 27 days
- Hose, Non-metallicClosing in 27 days
- Panel, Floor, WatercraftClosing in 27 days
- Sextant, Marine; [WSDC: 23N] End Item: Ship, Ohio Class SSN (Trident) PR: 7017536460 NSN: 6605-012533442Closing in 27 days
- 15--LIMITER,TORQUE,AIRC, IN REPAIR/MODIFICATION OFClosing in 27 days
- 16--TORQUE LIMITER ASSE, IN REPAIR/MODIFICATION OFClosing in 27 days
- 47--CONNECTION,FLEXIBLEClosing in 27 days
- 48--VALVE,LINEAR,DIRECTClosing in 27 days
- 48--VALVE,REGULATING,FL, IN REPAIR/MODIFICATION OFClosing in 27 days
- 48--VALVE REGULATING SY, IN REPAIR/MODIFICATION OFClosing in 27 days
- CABLE ASSEMBLY,SPECClosing in 27 days