Industry directory
Other Aircraft Parts and Auxiliary Equipment Manufacturing government contracts (NAICS 336413), page 3
Open federal, state and local contract notices classified under NAICS 336413.
Data as of Nov 14, 2026 · Sources: SAM.gov and Grants.gov · About this data
Open notices, page 3 of 14
- 42--PROTECTOR,HEARINGClosing in 3 daysPosted Nov 4, 2026 · Due Nov 17, 2026
- 59--HOLDER,ELECTRICAL CARDClosing in 3 daysPosted Nov 4, 2026 · Due Nov 17, 2026
- Posted Nov 10, 2026 · Due Nov 17, 2026
- CAP, VALVEClosing in 3 daysPosted Oct 16, 2026 · Due Nov 17, 2026
- CONTROL ASSEMBLY, QUClosing in 3 daysPosted Oct 16, 2026 · Due Nov 17, 2026
- Posted Oct 1, 2026 · Due Nov 17, 2026
- C-130 Pison, Linear ActuaClosing in 3 daysPosted Oct 16, 2026 · Due Nov 17, 2026
- F-16 Piston, Reaction CylClosing in 3 daysPosted Oct 16, 2026 · Due Nov 17, 2026
- Posted Nov 5, 2026 · Due Nov 17, 2026
- STRAP,WEBBINGClosing in 3 daysPosted Aug 20, 2026 · Due Nov 17, 2026
- Valve, Breakaway, FuelClosing in 3 daysPosted Nov 13, 2026 · Due Nov 17, 2026
- Shipping and StorageClosing in 3 daysPosted Nov 10, 2026 · Due Nov 17, 2026
- PANEL ASSEMBLY,KEYClosing in 3 daysPosted Oct 30, 2026 · Due Nov 17, 2026
- Posted Nov 4, 2026 · Due Nov 17, 2026
- 15--FITTING,STRUCTURAL COMClosing in 4 daysPosted Nov 11, 2026 · Due Nov 18, 2026
- 15--PIVOT-SHAFT ASSEMBLYClosing in 4 daysPosted Nov 11, 2026 · Due Nov 18, 2026
- 15--SKIN,AIRCRAFTClosing in 4 daysPosted Nov 11, 2026 · Due Nov 18, 2026
- 16--COVER ASSY,AIRCRAFClosing in 4 daysPosted Nov 11, 2026 · Due Nov 18, 2026
- 15--ADAPTER ASSEMBLY,AUXILClosing in 4 daysPosted Nov 10, 2026 · Due Nov 18, 2026
- 15--CONVEYOR,ROLLER ASSEMBClosing in 4 daysPosted Nov 10, 2026 · Due Nov 18, 2026
- 15--INTERCOSTAL,AIRCRAFTClosing in 4 daysPosted Nov 10, 2026 · Due Nov 18, 2026
- 15--SKIN,AIRCRAFTClosing in 4 daysPosted Nov 10, 2026 · Due Nov 18, 2026
- 15--SKIN,AIRCRAFTClosing in 4 daysPosted Nov 10, 2026 · Due Nov 18, 2026
- 15--TUBE,TORQUE,ACTUATOR AClosing in 4 daysPosted Nov 10, 2026 · Due Nov 18, 2026
- 16--COVER,WINCHClosing in 4 daysPosted Nov 10, 2026 · Due Nov 18, 2026
- 16--GRIP ASSEMBLY,CONTROLLClosing in 4 daysPosted Nov 10, 2026 · Due Nov 18, 2026
- 16--GUIDE,SPRING,MALEClosing in 4 daysPosted Nov 10, 2026 · Due Nov 18, 2026
- 16--KIT ZERO HOURClosing in 4 daysPosted Nov 10, 2026 · Due Nov 18, 2026
- 16--COVER,SEAT CUSHION,AIRClosing in 4 daysPosted Nov 3, 2026 · Due Nov 18, 2026
- 16--SEAT,AIRCRAFTClosing in 4 daysPosted Nov 3, 2026 · Due Nov 18, 2026
- 17--GAUGE,PRESSURE,AIRCClosing in 4 daysPosted Nov 3, 2026 · Due Nov 18, 2026
- 29--FILTER ELEMENT,INTAKEClosing in 4 daysPosted Nov 3, 2026 · Due Nov 18, 2026
- 30--HOUSING PART,MECHANICAClosing in 4 daysPosted Nov 3, 2026 · Due Nov 18, 2026
- 30--SPROCKET WHEELClosing in 4 daysPosted Nov 3, 2026 · Due Nov 18, 2026
- 59--DISCHARGER,ELECTROSTATClosing in 4 daysPosted Nov 3, 2026 · Due Nov 18, 2026
- Proximity Switch_End_Item_KC-46_NSN_5930016547246KT_PN_8-497-04Closing in 4 daysPosted Nov 11, 2026 · Due Nov 18, 2026
- 16--EVAPORATOR FAN,AIRC, IN REPAIR/MODIFICATION OFClosing in 4 daysPosted Aug 21, 2026 · Due Nov 18, 2026
- 16--TURBINE,COOLING, IN REPAIR/MODIFICATION OFClosing in 4 daysPosted Aug 21, 2026 · Due Nov 18, 2026
- 16 - FMS REPAIR - COUPLING, DRIVE SHAFClosing in 4 daysPosted Nov 4, 2026 · Due Nov 18, 2026
- Various ItemsClosing in 4 daysPosted Nov 4, 2026 · Due Nov 18, 2026
- Oxygen ConcentratorClosing in 4 daysPosted Oct 20, 2026 · Due Nov 18, 2026
- Solicitation - Repair of the C-5 Automated Flight Control System Panel (AFCSP) and Communication/Navigation Panel (CNP)Closing in 4 daysPosted Nov 11, 2026 · Due Nov 18, 2026
- ACTUATOR, ELECTROMECClosing in 4 daysPosted Oct 20, 2026 · Due Nov 18, 2026
- Pump, CentrifugalClosing in 4 daysPosted Nov 4, 2026 · Due Nov 18, 2026
- SPRRA127RA017 CYLINDER ASSEMBLY,AClosing in 4 daysPosted Nov 14, 2026 · Due Nov 18, 2026
- B-2 Heat StacksClosing in 4 daysPosted Nov 3, 2026 · Due Nov 18, 2026
- CYLINDER ASSEMBLY,AClosing in 5 daysPosted Nov 4, 2026 · Due Nov 19, 2026
- 16--PARTICLE SEPARATOR,Closing in 5 daysPosted Nov 11, 2026 · Due Nov 19, 2026
- 15--PANEL,STRUCTURAL,AIRCRClosing in 5 daysPosted Nov 7, 2026 · Due Nov 19, 2026
- 16--CYLINDER,HYDRAULIC BRAClosing in 5 daysPosted Nov 5, 2026 · Due Nov 19, 2026