Presolicitation for Leased Space in Baltimore, MD
Presolicitation from General Services Administration.
Data as of Nov 16, 2026 · Sources: SAM.gov and Grants.gov · About this data
Notice details
- Sub-tier agency
- PUBLIC BUILDINGS SERVICE
- Notice type
- Presolicitation
- Solicitation number
- 5MD0504
- Product/service code
- X1AA
- Place of performance
- Baltimore, Maryland
- Posted
- Oct 29, 2026
- Response deadline
- Nov 11, 2026
- Closed
- Nov 11, 2026
- Source
- SAM.gov
Description
City: HUDSON Delineated Area: City of Baltimore Minimum Sq. Ft. (ABOA): 5,148 Maximum Sq. Ft. (ABOA): 5,688 Space Type: Office Parking Spaces (Total): 2 Parking Spaces (Surface): 0 Parking Spaces (Structured): Parking Spaces (Reserved): 2 Full Term: 10 Firm Term: 5 Option Term: 0 Years Additional Requirements: Offered space must meet Government requirements for fire safety, accessibility, seismic, and sustainability standards per the terms of the Lease. A fully serviced lease is Offered space shall not be in the 1-percent-annual chance floodplain (formerly referred to as �100-year� floodplain). Entities are advised to familiarize themselves with the telecommunications prohibitions outlined under Section 889 of the FY19 National Defense Authorization Act (NDAA), as implemented by the Federal Acquisition Regulation (FAR). ). For more information, visit: https://acquisition.gov/FAR-Case-2019-009/889_Part_B. The U.S. Government currently occupies office and related space in a building under a lease in Baltimore, MD that will be expiring. The Government is considering alternative space if economically advantageous. In making this determination, the Government will consider, among other things, the availability of alternative space that potentially can satisfy the Government�s requirements, as well as costs likely to be incurred through relocating, such as physical move costs, replication of tenant improvements and telecommunication infrastructure, and non-productive agency
Summarized from the official notice. The description is shortened; read the full text on the official notice.
Official notice
Requirements and amendments are controlled by the official notice.
DSE verdict
The DSE fit verdict for this notice is available to DSE GovCon subscribers. It is not published on this page.
See DSE GovCon plans →