Contract opportunity

KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS

Solicitation from Department of Energy.

Data as of Nov 16, 2026 · Sources: SAM.gov and Grants.gov · About this data

Closing in 32 daysResponse due Dec 18, 2026
Department of EnergyNAICS 237130
View on SAM.gov →

Notice details

Agency
Department of Energy
Sub-tier agency
ENERGY, DEPARTMENT OF
Notice type
Solicitation
Solicitation number
RFP-383167-CD
NAICS
237130 Power and Communication Line and Related Structures Construction
Product/service code
Z2MZ
Place of performance
Batavia, Illinois
Posted
Nov 6, 2026
Response deadline
Dec 18, 2026
Source
SAM.gov

Description

November 5, 2026- Amendment 1 issued to clarify timne and location of the Pre-Proposal Meeting. This scope of work is to rebuild and renovate the Kautz Road Substation (KRS), which is UIP subproject SP-2. The KRS supplies electricity to various lab buildings and systems. These systems serve both conventional facility needs, as well as process utility requirements. It is vital to Fermilab�s mission that KRS be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab�s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 � 60 Calendar Days after issuance of Notice to Proceed (NTP)

Summarized from the official notice. The description is shortened; read the full text on the official notice.

Official notice

View on SAM.gov →

Requirements and amendments are controlled by the official notice.

DSE verdict

The DSE fit verdict for this notice is available to DSE GovCon subscribers. It is not published on this page.

See DSE GovCon plans →

Similar open notices

  1. ENERGY, DEPARTMENT OF

    NAICS 237130Posted Nov 13, 2026 · Due Mar 5, 2027

Get free alerts

Email alerts for notices like this one are free on DSE GovCon Intelligence.

Set up free alerts →

Frequently asked questions

When is the response deadline?

The published deadline is Dec 18, 2026. That is 32 days after the data date.

What NAICS code applies?

NAICS 237130, Power and Communication Line and Related Structures Construction.

Which agency issued this notice?

Department of Energy.

Where is the official notice?

The link under Official notice opens the source listing.