J065--KG - HVAC upgrades (VA-27-00018970 / 36C245-27-AP-1028 / 512-27-1-contact details on the official notice ) EDA: 12/11/2026 ; STATUS: Moved to Keysha Gorman for action on 11/6/2026 (DGM) ; NEED DATE 11-20-26 (unrealistic per PALT) MOVED TO BC FOR ASSIGNMENT
Solicitation from Department of Veterans Affairs.
Data as of Nov 16, 2026 · Sources: SAM.gov and Grants.gov · About this data
Notice details
- Sub-tier agency
- VETERANS AFFAIRS, DEPARTMENT OF
- Notice type
- Solicitation
- Solicitation number
- 36C24527Q0061
- Product/service code
- J065
- Posted
- Nov 13, 2026
- Response deadline
- Nov 30, 2026
- Source
- SAM.gov
Description
Presolicitation Notice Presolicitation Notice Page 5 of 5 Presolicitation Notice *=Required Field Presolicitation Notice Page 1 of 5 The contractor will provide all material, labor, equipment, and supervision necessary to complete the above-named project at the VA Maryland Health Care System (VAMHCS), Building 1 Community Living Center (CLC) of the Loch Raven Campus. Primary Deliverables and Project Requirements Covid Ward 2nd floor B wing Upgrade exhaust fans Air Handling Unit (AHU-B) located in attic Replace and upgrade EF-1A and EF-1B for higher CFM outputs Install heat tracing for chillers Wiring and junction box located in room G-15. Chiller located outside CLC in the pit behind the service road. Assess current heat tracing for chill water line. Complete and terminate existing heat tracing wiring to an emergency electrical panel in G-17 in coordination with the VA. Panel selection is TBD. Install a 20-amp GFPE circuit breaker for the heat tracing to the panel selected by the VA. Kitchen basement Replace cooling coil(s) AHU-E located in attic. Replace fan motor AHU-E located in attic. AHU has one fan. New motor must be rated for and capable of sustaining a fan speed of 60Hz. Replace Variable Frequency Drive (VFD) VFD located in the attic and attached to the AHU Replace VFD in kind with Manufacturer (ABB) Controls Integration & Coordination VA has an existing contract with Johnson Controls International (JCI). The contractor shall coordinate with the COR and Facility
Summarized from the official notice. The description is shortened; read the full text on the official notice.
Official notice
Requirements and amendments are controlled by the official notice.
DSE verdict
The DSE fit verdict for this notice is available to DSE GovCon subscribers. It is not published on this page.
See DSE GovCon plans →Similar open notices
- Posted Nov 4, 2026 · Due Nov 16, 2026
- H144--Steam Quality Testing ServiceClosing in 4 daysPosted Nov 14, 2026 · Due Nov 20, 2026
- J041--RFQ SDVOSB Set-Aside CHILLER TUBE CLEANING SERVICESClosing in 11 daysPosted Oct 31, 2026 · Due Nov 27, 2026
Get free alerts
Email alerts for notices like this one are free on DSE GovCon Intelligence.
Set up free alerts →Frequently asked questions
When is the response deadline?
The published deadline is Nov 30, 2026. That is 14 days after the data date.
What NAICS code applies?
NAICS 561210, Facilities Support Services.
Which agency issued this notice?
Department of Veterans Affairs.
Where is the official notice?
The link under Official notice opens the source listing.