FWS - Pixley NWR Water Recirculation Design-Build
Combined Synopsis/Solicitation from Department of the Interior.
Data as of Nov 16, 2026 · Sources: SAM.gov and Grants.gov · About this data
Notice details
- Sub-tier agency
- DEPARTMENTAL OFFICES
- Notice type
- Combined Synopsis/Solicitation
- Solicitation number
- 140FF027R0003
- Product/service code
- Y1JZ
- Set-aside
- Total Small Business
- Posted
- Oct 31, 2026
- Response deadline
- Nov 30, 2026
- Source
- SAM.gov
Description
This is a combined synopsis/solicitation for commercial services prepared in accordance with Revolutionary FAR Overhaul (RFO) Part 12, as supplemented with additional information included in this notice. This announcement constitutes only solicitation. Offers are being requested, and a separate written solicitation will not be issued. The U.S. Fish & Wildlife Service, Pixley National Wildlife Refuge provides 755 acres of wetland habitat for migratory waterfowl and other water birds and relies on three deep groundwater wells for irrigation and flooding. This project will improve water reuse and reduce groundwater pumping demands, particularly during drought years. The contractor shall design and construct a water recirculation system consisting of approximately 1.2 miles of PVC pipeline connecting the wetlands� lowest topographical point to the existing pipeline farther east. The system shall include a pump at this low point to move water upslope for recirculation and critical irrigation. The contractor shall secure the pump station with a 12-foot-tall, gated chain-link enclosure topped with barbed wire. Excavated soil may be reused on refuge property, and restoration or seeding of disturbed ground will not be required. The construction magnitude is estimated to be between $700,000.00 to $750,000.00. The office is located � Meeting Point: LAT: 35�54'23.08"N LONG: 119�22'33.14"W Pixley National Wildlife Refuge 10811 Corcoran Road Delano, CA 93215 Kern County, California The
Summarized from the official notice. The description is shortened; read the full text on the official notice.
Official notice
Requirements and amendments are controlled by the official notice.
DSE verdict
The DSE fit verdict for this notice is available to DSE GovCon subscribers. It is not published on this page.
See DSE GovCon plans →Similar open notices
- Y--FAIR Route 3 - 96-inch CMP Replacement ProjectClosing in 2 daysPosted Nov 14, 2026 · Due Nov 18, 2026
- East Bear Creek Pumping Plant and Pipeline ModerniClosing in 2 daysPosted Nov 4, 2026 · Due Nov 18, 2026
- Y--Shasta Powerplant (SH-PP) Compressor Room ModernizationClosing in 4 daysPosted Nov 5, 2026 · Due Nov 20, 2026
- Y--JELA 325250 335621 - Rehabilitate CemeteryClosing in 24 daysPosted Nov 7, 2026 · Due Dec 10, 2026
- MOD/MODE/US BYPASS CANAL REPAIRSClosing in 28 daysPosted Nov 13, 2026 · Due Dec 14, 2026
Get free alerts
Email alerts for notices like this one are free on DSE GovCon Intelligence.
Set up free alerts →Frequently asked questions
When is the response deadline?
The published deadline is Nov 30, 2026. That is 14 days after the data date.
Is there a set-aside?
The notice lists the set-aside Total Small Business.
What NAICS code applies?
NAICS 237990, Other Heavy and Civil Engineering Construction.
Which agency issued this notice?
Department of the Interior.
Where is the official notice?
The link under Official notice opens the source listing.