DESIGN-BID-BUILD (DBB) PHASE III GROUNDWATER TREATMENT PLANT CONSTRUCTION, NWIRP BETHPAGE, WANTAGH, NEW YORK
Presolicitation from Department of Defense.
Data as of Nov 16, 2026 · Sources: SAM.gov and Grants.gov · About this data
Notice details
- Agency
- Department of Defense
- Sub-tier agency
- DEPT OF THE NAVY
- Notice type
- Presolicitation
- Solicitation number
- N4008527R0048
- Product/service code
- Y1NE
- Place of performance
- Bethpage, New York
- Posted
- Nov 14, 2026
- Response deadline
- Dec 3, 2026
- Source
- SAM.gov
Description
Solicitation Number: N4008527R0048 This notice does NOT constitute a request for proposal, request for quote, or invitation for bid. The intent of this pre-solicitation synopsis is to make notice of a proposed contract action for performing construction services for Design-Bid-Build (DBB) Phase III Groundwater Treatment Plant Construction, Naval Weapons Industrial Reserve Plant (NWIRP) Bethpage, Wantagh, New York. PROJECT DESCRIPTION: This Design-Bid-Build project aims to address a plume of contaminated groundwater that has spread south from the former NWIRP and Northrop Grumman properties. This contamination, primarily consisting of chlorinated VOCs (like TCE) and 1,4-dioxane, is being remediated as required by the Navy and the New York State Department of Environmental Conservation. The core of this phase is the construction of a new Groundwater Treatment Plant (GWTP) designed to intercept the leading edge of the plume. The plant will treat the captured water to meet drinking water standards using a process that includes sand filters, an Advanced Oxidation Process (AOP), and Granular Activated Carbon (GAC). The scope of work involves the complete construction and commissioning of the facility. This includes completing three groundwater recovery wells and the associated underground piping to bring contaminated water to the plant. The facility itself will house numerous systems, including large storage tanks, multiple filter types, the AOP system, and granular activated
Summarized from the official notice. The description is shortened; read the full text on the official notice.
Official notice
Requirements and amendments are controlled by the official notice.
DSE verdict
The DSE fit verdict for this notice is available to DSE GovCon subscribers. It is not published on this page.
See DSE GovCon plans →Similar open notices
- Mud Mountain Dam Sewage Lagoon RepairClosing in 8 daysPosted Nov 10, 2026 · Due Nov 24, 2026
- Atchison Storm Sewer Separation Improvements, Atchison, KansasClosing in 8 daysPosted Nov 14, 2026 · Due Nov 24, 2026
- Posted Oct 28, 2026 · Due Dec 3, 2026
- USACE SPK DBB Construction - Calaveras Wastewater Treatment Plant Improvements - Copperopolis, CAClosing in 21 daysPosted Oct 9, 2026 · Due Dec 7, 2026
- BRINE PIPELINE ACCESS IMPROVEMENTSClosing in 80 daysPosted Aug 13, 2026 · Due Feb 4, 2027
Get free alerts
Email alerts for notices like this one are free on DSE GovCon Intelligence.
Set up free alerts →Frequently asked questions
When is the response deadline?
The published deadline is Dec 3, 2026. That is 17 days after the data date.
What NAICS code applies?
NAICS 237110, Water and Sewer Line and Related Structures Construction.
Which agency issued this notice?
Department of Defense.
Where is the official notice?
The link under Official notice opens the source listing.