Contract opportunity

DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan

Solicitation from Department of Defense.

Data as of Oct 24, 2026. Sources: SAM.gov and Grants.gov. Snapshot govcon-directory-20261024T104923Z-2151694.

This product uses the Grants.gov API but is not endorsed or certified by the U.S. Department of Health and Human Services. Counts and totals are computed by DSE from public SAM.gov and Grants.gov notices. Text from Grants.gov may be shortened or have contact details removed. The original notice on Grants.gov is the authoritative version.

Closing in 93 days

Notice details

Agency
Department of Defense
Sub-tier agency
DEPT OF THE ARMY
Notice type
Solicitation
Solicitation number
W912HV26RA009
NAICS
237120 Oil and Gas Pipeline and Related Structures Construction
Product/service code
Y1NA
Posted
Oct 20, 2026
Response deadline
Jan 25, 2027
Source
SAM.gov

Description

Update 19 October 2026: Updated RFI Response Report has been posted to PIEE. Update 25 September 2026 : Preliminary RFI Response Report has been posted to PIEE. Update 14 September 2026: Attached Site Visit Roster. Update 10 September 2026: Attached Pre-Proposal Conference Slides. Project Title: DESC2103C - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building. The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank. The Pump House will be of reinforced concrete construction and site adapted to meet local conditions. The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways. The tank is to be steel with concrete outer wall with a rolling cover for access to

Summarized from the official notice. The description is shortened; read the full text on the official notice.

Official notice

View on SAM.gov →

Requirements and amendments are controlled by the official notice.

DSE verdict

The DSE fit verdict for this notice is available to DSE GovCon subscribers. It is not published on this page.

See DSE GovCon plans →

Similar open notices

  1. Kingsley Field Fueling System RepairsClosing in 5 daysDEPT OF DEFENSE · Posted Oct 9, 2026 · Closes Oct 29, 2026
  2. Mather Fueling System RepairsClosing in 27 daysDEPT OF DEFENSE · Total Small Business · Posted Oct 24, 2026 · Closes Nov 20, 2026
  3. WH Ford RTC Fueling System RepairsClosing in 30 daysDEPT OF DEFENSE · Total Small Business · Posted Oct 21, 2026 · Closes Nov 23, 2026
  4. W.H. Ford RTC Fueling System RepairsOpen, no deadline statedDEPT OF DEFENSE · Posted Sep 11, 2026 · No deadline stated
  5. API 653 Fuel Tank Repairs and Maintenance - Eielson AFB, AlaskaOpen, no deadline statedDEPT OF DEFENSE · 8(a) · Posted Aug 4, 2026 · No deadline stated

Get free alerts

Email alerts for notices like this one are free on DSE GovCon Intelligence.

Set up free alerts →

Frequently asked questions

When is the response deadline?

The published deadline is Jan 25, 2027. That is 93 days after the data date.

What NAICS code applies?

NAICS 237120, Oil and Gas Pipeline and Related Structures Construction.

Which agency issued this notice?

Department of Defense.

Where is the official notice?

The link under Official notice opens the source listing.