CO BR UCPO Blue Mesa Road(1) Blue Mesa Road
Presolicitation from Department of Transportation.
Data as of Oct 24, 2026. Sources: SAM.gov and Grants.gov. Snapshot govcon-directory-20261024T104923Z-2151694.
This product uses the Grants.gov API but is not endorsed or certified by the U.S. Department of Health and Human Services. Counts and totals are computed by DSE from public SAM.gov and Grants.gov notices. Text from Grants.gov may be shortened or have contact details removed. The original notice on Grants.gov is the authoritative version.
Open, no deadline stated
Notice details
- Sub-tier agency
- FEDERAL HIGHWAY ADMINISTRATION
- Notice type
- Presolicitation
- Solicitation number
- 6982AF27B000009
- Product/service code
- Y1LB
- Set-aside
- Total Small Business
- Place of performance
- Gunnison, Colorado
- Posted
- Oct 21, 2026
- Response deadline
- No deadline stated
- Source
- SAM.gov
Description
THIS IS NOT A REQUEST FOR BID � PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. PROJECT NAME: CO BR UCPO Blue Mesa Road(1) Blue Mesa Road Blue Mesa Road is a 1.44-mile corridor located in Gunnison County, CO and provides access to the Bureau of Reclamation (BOR) Power Plant and Pine Creek Trailhead recreational activities on the Curecanti National Recreational Area. SCOPE OF THE WORK Schedule A: Proposed rehabilitation of 0.86 miles to replace existing gravel roadway with asphalt concrete pavement. Reconstruction/Rehabilitation, as needed, for 0.24 miles of existing asphalt to incorporate raising roadway profile at US 50 intersection, drainage improvements including replacement and/or lining of damaged culverts, relocation of traffic counters, formalize parking area with ADA stalls, signing and striping, ditch reconditioning, rockfall mitigation. Option X: Proposed rehabilitation of 0.34 miles to replace existing gravel roadway with asphalt concrete pavement from BOR gate to Blue Mesa Power Plant, drainage improvements to include replacement of damaged culverts, signing and striping, ditch reconditioning, installation of 6� electrical conduit for purposes of future automatic gate installation. Option Y: Proposed 6-inch electric conduit installation and 2 ft x 2 ft max trenching for 2,215 LF miles from the electric security gate to The Blue Mesa Power Plant. Conduit will provide future access for BOR to provide electric connection to security gate. PRINCIPAL WORK ITEMS: Schedule
Summarized from the official notice. The description is shortened; read the full text on the official notice.
Official notice
Requirements and amendments are controlled by the official notice.
DSE verdict
The DSE fit verdict for this notice is available to DSE GovCon subscribers. It is not published on this page.
See DSE GovCon plans →Similar open notices
- CO NP ROMO 407(1) Holzwarth CulvertClosing in 3 days
- Natchez Trace Parkway Project MS NP NATR 3F26Closing in 10 days
- ND NP THRO 204(1) Buck Hill RoadClosing in 10 days
- TX FW LGA 10(5) Steve Thompson Wildlife DriveClosing in 10 days
- WY BR WYAO US20(1) US 20 and Hayden Arch Bridge RepairsClosing in 11 days
Get free alerts
Email alerts for notices like this one are free on DSE GovCon Intelligence.
Set up free alerts →Frequently asked questions
Is there a set-aside?
The notice lists the set-aside Total Small Business.
What NAICS code applies?
NAICS 237310, Highway, Street, and Bridge Construction.
Which agency issued this notice?
Department of Transportation.
Where is the official notice?
The link under Official notice opens the source listing.