Borough of Millvale, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation
Presolicitation from Department of Defense.
Data as of Oct 24, 2026. Sources: SAM.gov and Grants.gov. Snapshot govcon-directory-20261024T104923Z-2151694.
This product uses the Grants.gov API but is not endorsed or certified by the U.S. Department of Health and Human Services. Counts and totals are computed by DSE from public SAM.gov and Grants.gov notices. Text from Grants.gov may be shortened or have contact details removed. The original notice on Grants.gov is the authoritative version.
Closing in 10 days
Notice details
- Agency
- Department of Defense
- Sub-tier agency
- DEPT OF THE ARMY
- Notice type
- Presolicitation
- Solicitation number
- W911WN27QA004
- Product/service code
- Y1KZ
- Set-aside
- Total Small Business
- Place of performance
- Millvale, Pennsylvania
- Posted
- Oct 20, 2026
- Response deadline
- Nov 3, 2026
- Source
- SAM.gov
Description
This is a Presolicitation Notice only. This is not a Solicitation (Request for Quote). No purchase order will be awarded from this announcement. Any applicable attachments for this project (i.e., Drawings and Specifications) will be issued at the time of the Solicitation. This procurement is a 100% Total Small Business Set-Aside. All interested and capable small business offerors are encouraged to submit a quote. Project Description The Millvale LPP was constructed by U.S. Army Corps of Engineers (USACE) in 1980 under the authority of Section 205 of the Flood Control Act of 1948 as amended. The project consists of about 6,200 feet of channel improvement including concrete gravity retaining walls, concrete wall supports, anchored concrete toe blocks, concrete cap walls, stone-filled gabion mattresses, flap gates and access ramps. The LPP is an urban Flood Control Work (FCW), and it is not a multipurpose project. Heavy rains from 1-12 April 2024 caused flooding which damaged the Project within Girty�s Run, including bank erosion, shoaling, erosion of the improved channel, ruptured gabion baskets, washed-out concrete buttresses, and erosion of grouted riprap. Of particular concern are the washed-out buttresses which have migrated to the center of the improved channel, impeding streamflow. If the buttresses are not removed and stream bank improvements continue to deteriorate, there is a risk that debris will continue to accumulate and could ultimately damage the channel
Summarized from the official notice. The description is shortened; read the full text on the official notice.
Official notice
Requirements and amendments are controlled by the official notice.
DSE verdict
The DSE fit verdict for this notice is available to DSE GovCon subscribers. It is not published on this page.
See DSE GovCon plans →Similar open notices
- Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)Closing in 2 days
- Borough of Etna, Pennsylvania, Local Protection Project (LPP) PL84-99 RehabilitationClosing in 2 days
- Palm Beach Harbor, South Jetty Rehabilitation 2026, Palm Beach County, FloridaClosing in 2 days
- Sources Sought/Request for Information Upper Mississippi River Restoration (UMRR) – Quincy Bay Habitat Rehabilitation and Enhancement Project- Stage 1Closing in 2 days
- Joe Pool Dam Slide RepairsClosing in 3 days
Get free alerts
Email alerts for notices like this one are free on DSE GovCon Intelligence.
Set up free alerts →Frequently asked questions
When is the response deadline?
The published deadline is Nov 3, 2026. That is 10 days after the data date.
Is there a set-aside?
The notice lists the set-aside Total Small Business.
What NAICS code applies?
NAICS 237990, Other Heavy and Civil Engineering Construction.
Which agency issued this notice?
Department of Defense.
Where is the official notice?
The link under Official notice opens the source listing.