Contract opportunity

ATR Plant Protection System (PPS) Seismic Switch Replacement

Sources Sought from Department of Energy.

Data as of Nov 16, 2026 · Sources: SAM.gov and Grants.gov · About this data

Closing in 159 daysResponse due Apr 24, 2027
Department of Energy
View on SAM.gov →

Notice details

Agency
Department of Energy
Sub-tier agency
ENERGY, DEPARTMENT OF
Notice type
Sources Sought
Solicitation number
INL-27-002
Place of performance
Idaho
Posted
Nov 11, 2026
Response deadline
Apr 24, 2027
Source
SAM.gov

Description

INTRODUCTION Battelle Energy Alliance, LLC (BEA), the management and operating contractor for the U.S. Department of Energy-owned Idaho National Laboratory (INL), is seeking Expressions of Interest (EOI) from qualified suppliers capable of providing environmentally and seismically qualified seismic switches for use in the Advanced Test Reactor (ATR) Plant Protection System (PPS). The purpose of this EOI is to identify suppliers with the technical capability, quality assurance program, testing facilities, and experience necessary to provide safety-related seismic switch equipment qualified for nuclear applications. This EOI is being issued for market research and acquisition planning purposes and is intended to identify potential suppliers for a future procurement opportunity. The EOI process is used by INL to develop a list of qualified and interested vendors that may be considered for future solicitations. BACKGROUND The ATR Plant Protection System currently utilizes seismic switches to provide a critical reactor protection function. Seismic switches detect ground motion and initiate a reactor scram when predetermined seismic thresholds are exceeded. The existing Kinemetrics Model TS-3A seismic switches are obsolete and have demonstrated performance degradation, resulting in increased reliance on limited spare inventory. Additionally, one seismic switch is currently out of service, placing the PPS in a reduced logic configuration. Replacement with modern, supported

Summarized from the official notice. The description is shortened; read the full text on the official notice.

Official notice

View on SAM.gov →

Requirements and amendments are controlled by the official notice.

DSE verdict

The DSE fit verdict for this notice is available to DSE GovCon subscribers. It is not published on this page.

See DSE GovCon plans →

Get free alerts

Email alerts for notices like this one are free on DSE GovCon Intelligence.

Set up free alerts →

Frequently asked questions

When is the response deadline?

The published deadline is Apr 24, 2027. That is 159 days after the data date.

Which agency issued this notice?

Department of Energy.

Where is the official notice?

The link under Official notice opens the source listing.