66--IRA - High-Temperature Chamber Furnace
Sources Sought from Department of Energy.
Data as of Nov 16, 2026 · Sources: SAM.gov and Grants.gov · About this data
Notice details
- Agency
- Department of Energy
- Sub-tier agency
- ENERGY, DEPARTMENT OF
- Notice type
- Sources Sought
- Solicitation number
- 89243327NEX000003
- Product/service code
- 6640
- Posted
- Nov 11, 2026
- Response deadline
- Nov 16, 2026
- Source
- SAM.gov
Description
This amendment is to address several requests for clarifications associated with our Technical Specifications. Q1. Facility Access and Rigging: The specifications require installation at the R&D plateau on the NETL Pittsburgh site. Does the specific facility have a loading dock capable of receiving standard freight, and is there a clear, at-grade, or freight-elevator-accessible path to the final installation room with adequate door clearances for a 100 kW system? A1: NETL has a clear path to the final installation area with adequate door clearances for a 100 kW system. Q2. Utility Proximity: The furnace requires a 480-volt, three-phase, 60 Hz power supply supporting an overall power of at least 100 kW. Is the necessary hardwire drop or disconnect already existing within the immediate footprint of the intended installation area, or will the contractor be responsible for routing power from a distant sub-panel? A2: NETL is responsible for installing all necessary hardwire drops or disconnects. Q3. Gas Supply and Exhaust: The system requires a fueled incinerator torch to combust organic outgassing. Will the Government supply the necessary process and sweep gases (e.g, Argon, Nitrogen, Propane/Natural gas) via existing facility lines, and is there an existing facility exhaust or fume hood integration point for the torch output? A3: NETL is responsible for installing all necessary gases, gas lines, and venting lines. Q4. Lead Times and Compliance: Given that Brand Name or Equal
Summarized from the official notice. The description is shortened; read the full text on the official notice.
Official notice
Requirements and amendments are controlled by the official notice.
DSE verdict
The DSE fit verdict for this notice is available to DSE GovCon subscribers. It is not published on this page.
See DSE GovCon plans →Similar open notices
- Custom R&D Industrial FurnaceClosing in 15 daysPosted Nov 13, 2026 · Due Dec 1, 2026
Get free alerts
Email alerts for notices like this one are free on DSE GovCon Intelligence.
Set up free alerts →Frequently asked questions
When is the response deadline?
The published deadline is Nov 16, 2026. That is 0 days after the data date.
What NAICS code applies?
NAICS 333994, Industrial Process Furnace and Oven Manufacturing.
Which agency issued this notice?
Department of Energy.
Where is the official notice?
The link under Official notice opens the source listing.