Y--NGWSP Cutter Lateral Reach 21 Booster Plant
Presolicitation from Department of the Interior.
Data as of Oct 24, 2026. Sources: SAM.gov and Grants.gov. Snapshot govcon-directory-20261024T104923Z-2151694.
This product uses the Grants.gov API but is not endorsed or certified by the U.S. Department of Health and Human Services. Counts and totals are computed by DSE from public SAM.gov and Grants.gov notices. Text from Grants.gov may be shortened or have contact details removed. The original notice on Grants.gov is the authoritative version.
Closing in 6 days
Notice details
- Sub-tier agency
- BUREAU OF RECLAMATION
- Notice type
- Presolicitation
- Solicitation number
- 140R4026B0003
- Product/service code
- Y1KZ
- Set-aside
- Total Small Business
- Posted
- Oct 1, 2026
- Response deadline
- Oct 30, 2026
- Source
- SAM.gov
Description
Pre-Solicitation Notice: NGWSP Cutter Lateral Reach 21 Booster Plant PURPOSE: The U.S. Bureau of Reclamation, Upper Colorado Basin Region, Four Corners Construction Office (FCCO), is issuing this pre-solicitation notice for a contemplated construction project titled: Navajo Gallup Water Supply Project (NGWSP) Cutter Lateral Reach 21 Booster Plant. This requirement is being procured in accordance with Part 14 of the Federal Acquisition Regulations (FAR) with a set-aside for small businesses. The Bureau of Reclamation intends to issue a competitive solicitation for this requirement. Based on market research it was determined that there were a sufficient number of qualified small businesses with sufficient bonding capacity to perform as the prime contractor on this project, and as such, it is anticipated to be set-aside for small businesses. PROJECT DESCRIPTION: The Navajo Gallup Water Supply Project (NGWSP) is a major infrastructure project that once constructed, will convey a reliable municipal and industrial water supply from the San Juan River to the eastern section of the Navajo Nation, southwestern portion of the Jicarilla Apache Nation, and the city of Gallup, New Mexico via approximately 280 miles of pipeline, several pumping plants, and two water treatment plants. The principal components of work for the Cutter Lateral Reach 21 Booster Plant include, but are not limited to, the following: 1. Pre-engineered concrete booster pump station, concrete foundation pad, pipe
Summarized from the official notice. The description is shortened; read the full text on the official notice.
Official notice
Requirements and amendments are controlled by the official notice.
DSE verdict
The DSE fit verdict for this notice is available to DSE GovCon subscribers. It is not published on this page.
See DSE GovCon plans →Similar open notices
- Y--GRAY WALL LIVESTOCK WATER WELLClosing in 2 days
- Z--YOSE 22866 Rehabilitate Hodgdon Meadows Water System and YOSE 196755 Extend HodClosing in 9 days
- Y--GRCA 318719 North Rim & Roaring Springs Rehabilitation ProgramClosing in 13 days
- C--BGNDRF PIPING UPGRADESClosing in 13 days
- Y--HAVO 326181 Rehabilitate Rainshed&Water TreatmentClosing in 14 days
Get free alerts
Email alerts for notices like this one are free on DSE GovCon Intelligence.
Set up free alerts →Frequently asked questions
When is the response deadline?
The published deadline is Oct 30, 2026. That is 6 days after the data date.
Is there a set-aside?
The notice lists the set-aside Total Small Business.
What NAICS code applies?
NAICS 237110, Water and Sewer Line and Related Structures Construction.
Which agency issued this notice?
Department of the Interior.
Where is the official notice?
The link under Official notice opens the source listing.