W912EK27BA003 - Detroit Project Office Detroit, MI Wayne County Roads, Parking, and Grounds Renovation
Presolicitation from Department of Defense.
Data as of Oct 24, 2026. Sources: SAM.gov and Grants.gov. Snapshot govcon-directory-20261024T104923Z-2151694.
This product uses the Grants.gov API but is not endorsed or certified by the U.S. Department of Health and Human Services. Counts and totals are computed by DSE from public SAM.gov and Grants.gov notices. Text from Grants.gov may be shortened or have contact details removed. The original notice on Grants.gov is the authoritative version.
Closing in 37 days
Notice details
- Agency
- Department of Defense
- Sub-tier agency
- DEPT OF THE ARMY
- Notice type
- Presolicitation
- Solicitation number
- W912EK27BA003
- Product/service code
- Y1QA
- Set-aside
- 8(a)
- Posted
- Oct 8, 2026
- Response deadline
- Nov 30, 2026
- Source
- SAM.gov
Description
Pre-Solicitation - W912EK27BA003 - Detroit Project Office Detroit, MI Wayne County Roads, Parking, and Grounds Renovation Completion Days: 365 Consecutive Calendar Days NAICS 237310 8(a) Competitive IFB The project includes, but is not limited to mobilization and demobilization; demolition to include removal of asphalt and concrete pavements, curbs and gutters, sidewalks and slabs, water main, valve and hydrant, storm sewer inlets, manholes and pipe, chain-link and ornamental fencing and gates, and flagpole; earthwork to include stripping, excavation, placement of backfill, compaction, and grading; water main and storm sewer work; aggregate work; asphalt paving; concrete paving, sidewalks, steps and light pole bases; installation of new metal handrail; installation of new ornamental fencing and electric pivot gate; electrical work to include installation of new conductors, new utility rack, new electric gate controls with keypad, intercom, camera and monitoring station, and new exterior pole lighting; installation of new pipe bollards;installation of new flag pole; pavement markings; damaged turf repair; seeding; and site restoration. ETA for IFB is within 30-60 days.
Summarized from the official notice.
Official notice
Requirements and amendments are controlled by the official notice.
DSE verdict
The DSE fit verdict for this notice is available to DSE GovCon subscribers. It is not published on this page.
See DSE GovCon plans →Similar open notices
- Sole Source Cyprus Helipad Apron ExpansionClosing in 3 days
- Bonneville Lock and Dam - Navigation Lock 1 Bridge ReplacementClosing in 5 days
- WWYK100209-Repair Perimeter Dr and Industrial BlvdClosing in 6 days
- Guardrail Installation, Mansfield Hollow Lake, Mansfield, CTClosing in 6 days
- PRIMARY RUNWAY AND PAVEMENT REPAIRS LOCATED AT JOINT RESERVE BASE NEW ORLEANS, LOUISIANA.Closing in 11 days
Get free alerts
Email alerts for notices like this one are free on DSE GovCon Intelligence.
Set up free alerts →Frequently asked questions
When is the response deadline?
The published deadline is Nov 30, 2026. That is 37 days after the data date.
Is there a set-aside?
The notice lists the set-aside 8(a).
What NAICS code applies?
NAICS 237310, Highway, Street, and Bridge Construction.
Which agency issued this notice?
Department of Defense.
Where is the official notice?
The link under Official notice opens the source listing.