Remanufacture of B-2 Actuator, Electromechanical, Rotary
Solicitation from Department of Defense.
Data as of Oct 24, 2026. Sources: SAM.gov and Grants.gov. Snapshot govcon-directory-20261024T104923Z-2151694.
This product uses the Grants.gov API but is not endorsed or certified by the U.S. Department of Health and Human Services. Counts and totals are computed by DSE from public SAM.gov and Grants.gov notices. Text from Grants.gov may be shortened or have contact details removed. The original notice on Grants.gov is the authoritative version.
Closing in 26 days
Notice details
- Agency
- Department of Defense
- Sub-tier agency
- DEPT OF THE AIR FORCE
- Notice type
- Solicitation
- Solicitation number
- FA8118-27-R-0001
- Product/service code
- 4810
- Posted
- Oct 8, 2026
- Response deadline
- Nov 19, 2026
- Source
- SAM.gov
Description
A 3-YEAR BASIC, FIRM FIXED PRICE REQUIREMENTS TYPE CONTRACT IS CONTEMPLATED. THE GOVERNMENT ANTICIPATES A SOLE SOURCE AWARD TO Eaton (CAGE: 86090). 52.232-18 Availability of Funds. As prescribed in 32.706-1(a), insert the following clause: Availability of Funds (Apr 1984) Funds are not presently available for this contract. The Government�s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer. (End of clause) (a) A Pre-Award Survey and/or Initial Production Evaluation (IPE) is required. Details are provided in Appendix A, paragraphs 1.2 and 1.3 respectively. (b) The contractor shall furnish all material, plant facilities, labor, parts, equipment, and expertise necessary to perform the remanufacture required to restore the end item to a like-new condition. The contractor shall also accomplish ALL necessary packing and preservation and packaging. ALL work shall be completed in accordance with the requirements specified herein (including attachments hereto) and all costs associated with work specifications, technical orders, and/or cost associated with Over and Above request (excluding missing parts) shall be included in the
Summarized from the official notice. The description is shortened; read the full text on the official notice.
Official notice
Requirements and amendments are controlled by the official notice.
DSE verdict
The DSE fit verdict for this notice is available to DSE GovCon subscribers. It is not published on this page.
See DSE GovCon plans →Similar open notices
- Circuit Card AssemblyClosing in 1 day
- Remanufacture of B-1B Heat ExchangersClosing in 2 days
- 17--PISTONS,MATCHED SE,Closing in 2 days
- 16--WINDSHIELD,LHClosing in 2 days
- “NSN 0680-01-contact details on the official notice, BELL CRANK, WSDC: 40A, HELICOPTER, BLACKHAWK, UH-60A, UH-60L, HH/UH-60M, UH-60V.”Closing in 2 days
Get free alerts
Email alerts for notices like this one are free on DSE GovCon Intelligence.
Set up free alerts →Frequently asked questions
When is the response deadline?
The published deadline is Nov 19, 2026. That is 26 days after the data date.
What NAICS code applies?
NAICS 336413, Other Aircraft Parts and Auxiliary Equipment Manufacturing.
Which agency issued this notice?
Department of Defense.
Where is the official notice?
The link under Official notice opens the source listing.