Pre-Solicitation Notice - Trenching, Conduit and Ground-well Installation
Presolicitation from Department of State.
Data as of Oct 24, 2026. Sources: SAM.gov and Grants.gov. Snapshot govcon-directory-20261024T104923Z-2151694.
This product uses the Grants.gov API but is not endorsed or certified by the U.S. Department of Health and Human Services. Counts and totals are computed by DSE from public SAM.gov and Grants.gov notices. Text from Grants.gov may be shortened or have contact details removed. The original notice on Grants.gov is the authoritative version.
Closing in 2 days
Notice details
- Agency
- Department of State
- Sub-tier agency
- STATE, DEPARTMENT OF
- Notice type
- Presolicitation
- Solicitation number
- PR16330526
- Product/service code
- J038
- Place of performance
- Saint Andrew, JM-02, JAM
- Posted
- Oct 10, 2026
- Response deadline
- Oct 26, 2026
- Source
- SAM.gov
Description
Description The United Stated Embassy in Kingston, Jamaica, plans to issue a Request for Quotations (RFQ) for trenching, conduit and ground-well installation in various locations on the Embassy compound. Scope of Work: The contractor will provide all labor, equipment, supervision, material specific to the back filling and compaction and management needed to complete the job Infrastructure Support System - Handhole / Underground Conduit System Trenching Nine locations have been identified requiring trench work. Thirteen locations have been identified requiring trench work. Before excavation, the Contractor shall locate and verify all existing utilities in the proposed trench alignment. If excavation interferes with existing drains, piping, or structures, the Contractor shall immediately notify, in writing, the COR and provide temporary protection for these systems before proceeding. Trenching from Handholes The Contractor shall make wall penetrations into existing manholes/handholes as required for the number and size of conduits entering and exiting each structure, in accordance with the drawings. Conduit Existing conduit shall remain in place unless the drawings specifically direct removal or modification. Under grass, soil, the Contractor shall install Schedule 80 PVC conduit with a minimum cover of 24 inches (610 mm) from finished grade to top of conduit, or as indicated on the drawings, whichever is greater. All underground 90 degree bends with a 12inch (305 mm) radius
Summarized from the official notice. The description is shortened; read the full text on the official notice.
Official notice
Requirements and amendments are controlled by the official notice.
DSE verdict
The DSE fit verdict for this notice is available to DSE GovCon subscribers. It is not published on this page.
See DSE GovCon plans →Get free alerts
Email alerts for notices like this one are free on DSE GovCon Intelligence.
Set up free alerts →Frequently asked questions
When is the response deadline?
The published deadline is Oct 26, 2026. That is 2 days after the data date.
What NAICS code applies?
NAICS 238910, Site Preparation Contractors.
Which agency issued this notice?
Department of State.
Where is the official notice?
The link under Official notice opens the source listing.