Design-Build Services – STM Security Fencing - North Boundary
Solicitation from Department of Energy.
Data as of Oct 24, 2026. Sources: SAM.gov and Grants.gov. Snapshot govcon-directory-20261024T104923Z-2151694.
This product uses the Grants.gov API but is not endorsed or certified by the U.S. Department of Health and Human Services. Counts and totals are computed by DSE from public SAM.gov and Grants.gov notices. Text from Grants.gov may be shortened or have contact details removed. The original notice on Grants.gov is the authoritative version.
Closing in 19 days
Notice details
- Agency
- Department of Energy
- Sub-tier agency
- ENERGY, DEPARTMENT OF
- Notice type
- Solicitation
- Solicitation number
- RFP-2027-27107
- Product/service code
- 5660
- Set-aside
- Total Small Business
- Place of performance
- Golden, Colorado
- Posted
- Oct 23, 2026
- Response deadline
- Nov 12, 2026
- Source
- SAM.gov
Description
This description is intended to summarize the project at a high level for procurement purposes. Interested parties must refer to the full SOW for complete technical requirements, detailed scope elements, design and construction deliverables, environmental obligations, safety standards, and administrative procedures. The SOW governs all expectations for this procurement. Project Overview The National Laboratory of the Rockies (NLR) is soliciting design?build services for installation of new perimeter fencing along the North boundary of the South Table Mountain (STM) Campus. The work includes designing and installing new fencing, removing designated sections of existing chain?link fence, and completing all related construction activities in accordance with NLR�s design standards, construction specifications, and DOE site requirements. Portions of the work require coordination with the State Historic Preservation Office (SHPO). Interested parties must reference the full Statement of Work (SOW) for all detailed scope, technical requirements, and performance expectations. Design?Build Requirements The Subcontractor shall develop and submit design documents consistent with NLR�s required 50% and 90% design reviews, followed by preparation of a complete 100% Issued?for?Construction package. All design work must comply with applicable codes, NLR Design Standards, and required CAD/BIM formats. Throughout the effort, the Subcontractor must maintain alignment with NLR�s design?to?cost
Summarized from the official notice. The description is shortened; read the full text on the official notice.
Official notice
Requirements and amendments are controlled by the official notice.
DSE verdict
The DSE fit verdict for this notice is available to DSE GovCon subscribers. It is not published on this page.
See DSE GovCon plans →Get free alerts
Email alerts for notices like this one are free on DSE GovCon Intelligence.
Set up free alerts →Frequently asked questions
When is the response deadline?
The published deadline is Nov 12, 2026. That is 19 days after the data date.
Is there a set-aside?
The notice lists the set-aside Total Small Business.
What NAICS code applies?
NAICS 238990, All Other Specialty Trade Contractors.
Which agency issued this notice?
Department of Energy.
Where is the official notice?
The link under Official notice opens the source listing.