Debris Boom Supply and Install at Harry S. Truman Lake Project
Combined Synopsis/Solicitation from Department of Defense.
Data as of Oct 24, 2026. Sources: SAM.gov and Grants.gov. Snapshot govcon-directory-20261024T104923Z-2151694.
This product uses the Grants.gov API but is not endorsed or certified by the U.S. Department of Health and Human Services. Counts and totals are computed by DSE from public SAM.gov and Grants.gov notices. Text from Grants.gov may be shortened or have contact details removed. The original notice on Grants.gov is the authoritative version.
Closing in 9 days
Notice details
- Agency
- Department of Defense
- Sub-tier agency
- DEPT OF THE ARMY
- Notice type
- Combined Synopsis/Solicitation
- Solicitation number
- W912DQ26QA080
- Product/service code
- 2090
- Place of performance
- Warsaw, Missouri
- Posted
- Oct 24, 2026
- Response deadline
- Nov 2, 2026
- Source
- SAM.gov
Description
The solicitation is amended to provide revisions to the Purchase Description, CLIN Structure, provide a Projnet Plan Room key to access the Bathymetry survey information and extend the quote due date. Also, Contractor Questions Answered Part 2 are posted. Contractor Questions/Government Answers are posted. The purpose of the debris boom is to prevent floating debris from impacting the dam's tainter gates, which is crucial for maintaining the full operational capacity of the spillway. The boom will also serve as a visual barrier to boaters. The Contractor shall provide all labor, materials, equipment, engineering, fabrication, delivery, and optional installation necessary to furnish a complete debris boom system at Harry S. Truman Dam. The approximately 2,000-foot boom shall be designed to intercept floating debris upstream of the spillway and withstand site-specific hydraulic, wind, wave, debris, and impact loading conditions. The debris boom shall be designed for an 800-foot-long by 3-foot-thick debris field, use a minimum safety factor of 2.0 for design loads, withstand a direct head-on impact from an 18-inch-diameter, 100-foot-long log traveling at the maximum design water velocity, and withstand design conditions including 50 mph wind speed and 5-foot wave height. This acquisition is not set-aside for small business concerns and is competed as full and open competition, Unrestricted. An organized site visit has been scheduled for: Friday, 9 October 2026 at 11am.
Summarized from the official notice.
Official notice
Requirements and amendments are controlled by the official notice.
DSE verdict
The DSE fit verdict for this notice is available to DSE GovCon subscribers. It is not published on this page.
See DSE GovCon plans →Similar open notices
- 53--BOLT,MACHINEClosing in 3 days
- 44--BAFFLE,FLUID COOLER,INClosing in 3 days
- Wheel Well StandsClosing in 4 days
- Steel and Other Metal Materials for the Marietta Repair Station: Stamford De-Watering Box Material PH 1Closing in 4 days
- Steel and other Materials for the Marietta Repair Station: Stamford Barrier Gate Material PH 2Closing in 4 days
Get free alerts
Email alerts for notices like this one are free on DSE GovCon Intelligence.
Set up free alerts →Frequently asked questions
When is the response deadline?
The published deadline is Nov 2, 2026. That is 9 days after the data date.
What NAICS code applies?
NAICS 332312, Fabricated Structural Metal Manufacturing.
Which agency issued this notice?
Department of Defense.
Where is the official notice?
The link under Official notice opens the source listing.